Yes, the renovations are still progressing. It's just that enough got done that they can be prioritized below everyday living!
Ran grounded electrical wiring into built-in so electronics can be plugged in safely and aesthetically instead of running through the pass-thru opening to kitchen outlet!
Began the long and tedious job of sanding and staining kitchen cupboards. Sorry I don't have a pic but they look 200x better than before!
Installed shelving in the basement and moved (most of !) the cleaning supplies and canned goods out of boxes throughout the kitchen and dining room.
Working on updating the faux brick in kitchen:
Eventually the refrigerator will go back here.
(See this post for original view.)
Raked up untold tons of limbs and branches from these trees!
In addition to trimming all the small trees and bushes along the side of the driveway. The pavement is covered over with 8" of soil from the overgrowth of this foliage! That means we need to cut everything back at least a foot to regain actual use of our two-car driveway.
Then we had a cookout using much of the wood from the trimming! It was a beautiful night sitting around the fire!
No comments:
Post a Comment