We will be replacing the bathtub and surround also and possibly some of the wall depending on what mold or damage we find when we take out the current fixtures.


After deciding to replace the ceiling, we had to verify that it was plaster, not drywall.
Then we went and bought an exhaust fan, vent, and light. Gulp! We priced tubs and surrounds as well. Double gulp!!!
Day 2:
UP DOWN


covering the toilet and sink


Removing the light fixture


Down comes the ceiling!!

Watch for falling plaster! lol
watch for falling ceiling!
Ceiling? What ceiling?!

Look how thick the plaster was!!! It was ridiculous heavy! We covered the fixtures with cardboard so they wouldn't get damaged!
Covering the opening with a tarp so there's a barrier between the bathroom and the attic rafters (dust, spiders, bats???)


Didn't get any good pictures of the cleanup. We picked up the big pieces and carried them out in a box and shoveled the rest of the debris out the window into a garbage can.


wipe, sweep, vacuum, dust, mop, Repeat!
Rigging up some kind of light--with no light!

Get some rest now because tomorrow is Day 3!