Another full day of working on the house. Got so much accomplished Even though it feels there are still a million more things to do.
Planned out strategy for installing all four washers and dryers.
Purchased a few more odds and ends to complete projects.
Cut off the old padlock on the outside garage door, added a new lock set including deadbolt to that door.
Pulled up the rest of the staples in the living room and all the sills leading into the bedrooms in the hallway.
Dismantled and moved all the left behind furniture from the bedroom to the garage, put it on Facebook and fielded offers to come pick that stuff up.
Cleaned out and organized all the random items that have collected in room we've been using to work out of.
Swept and mopped all 3 bedrooms so they are completely ready to receive belongings on moving day.
Filled in old door frame (insulation, patched paneling, shims) around new door in preparation for trim.
Sprayed the house inside perimeter with insecticide.
Mopped the basement.
Dismantled the sliding doors on the shower and remove them.
Replaced the cracked line on the dishwasher and reinstalled the dishwasher.
Crammed as much old carpet into garbage cans as possible for this week's pick-up.
No comments:
Post a Comment